3. Airframe Structure
Tools for this section

2 mm hex screwdriver
Pliers
Parts for this section


Parts:
Airframe Bottom
Main Body
(4x) Arm Brackets
(4x) Landing Gears
(4x) Arm Alignment Tool
(4x) Arm Assemblies (from Section 2.)
Fasteners:
(8x) M3x30mm Flat Head Screws
(8x) M3 Washer
(8x) M3 Nylon Lock Nut
Step 1: Airframe Stack


Prepare the Airframe Bottom and Main body.
Stack the Main Body on top of the Airframe Bottom.
Align the parts.



Ensure the antenna mount hole is facing the correct side.
Turn the stack upright to check that the hole is facing the XT-90 Mount side and NOT the FPV Camera Mount side.
Step 2: Arm Bracket Assembly

Prepare (1x) Arm Bracket, Airframe Stack, (2x) M3x30mm Flat Head Screws, (2x) M3 Washer, and (2x) M3 Nylon Lock Nut.
Align the Arm Bracket to one of the four corners of the Airframe Stack.


Insert the M3x30mm Flat Head Screw into the chamfered holes on the Arm Bracket.
Ensure the screws are inserted into the center hole of the row of three holes.
Align the full stack of parts until the screw ends exit the Airframe Bottom plate.

Step 3: Landing Gear Assembly


Prepare the (1x) Landing Gear.
Align the center holes on the Landing Gear to the
Step 4: Fastening Arm Bracket


Prepare (2x) M3 Washer and (2x) M3 Nylon Lock Nut.
Insert M3 Washers into each screw end on the bottom of the assembly.


Loosely screw in the M3 Nylon Lock Nut


Step 5: Repeat
Repeat Steps 1-4 for the remaining three corners.

Step 6: Arm Installation


Prepare (4x) Arm Assemblies.
Insert one Arm Assembly into the hole of the Arm Bracket on one of the corners.
Ensure the Arm Tube is seated all the way.

Repeat for the remaining three arms.
Step 7: Arm Alignment


Prepare (4x) Arm Alignment Tools.
Insert the Arm Alignment Tool peg into the holes in each Motor Mount.


Ensure the Alignment Tool peg is in all the way, and the bottom of the Alignment Tool is flush against a flat level surface.
Check that the Arm Tube is seated all the way into the Arm Bracket one final time.

Repeat for the remaining three arms.
Step 8: Final Arm Installation


Prepare the 2 mm hex screwdriver and Pliers.
Grab one of the Nylon Lock Nut underneath the airframe with the pliers.
Use the 2mm hex screwdriver to tighten the screw carefully.
Gradually tighten the screw until light resistance is felt.
Once light resistance is felt, repeat the process for the closest adjacent screw.
Repeat this process back and forth until hand tight.

Ensure that the Arm Bracket gap is even as pictured above.
If the gap is uneven, carefully loosen both sides and try to tighten both sides evenly by alternating tightening between each pair of screws.
Repeat this step for the remaining three Arm Bracket Assemblies.
Step 9: Final Prep

Proceed with a final check to ensure all the arms have been installed level.
Gently twist each arm to ensure that the screws are properly tightened.
If any movement is present during the twist test, repeat Step 8 for that arm.
Once everything is checked and ready, remove the Arm Alignment Tool.
Step 10: Section 3 Finished
Last updated